Rerun Backup Job on Failure, once machine comes online again.
Add feature to backup Scheduler
e.g. Number or retries – 3
e.g Time between retries. – 2 hours
When a Backup Fails due to power/connectivity failure, it will be ideal to have the backup rerun, when power/connectivity is restored
If Backup Fails on 9am Run, it would then automatically restart at 11am, 1pm and 3pm if continual failure. With the following settings (Number or retries – 3 AND Time between retries. – 2 hours)
We have customers with unstable utility power issues, and we do a lot of manual restarts of backup jobs during the day.